  • ‌9907-162‌: Classic analog 4-20mA I/P converter, optimized for basic turbine valve positioning applications with lower cost requirements
  • ‌9905-864‌: Digital ProAct™ II electric actuator controller, supporting direct valve position feedback for high-precision flow regulation
  • ‌505E Digital Governor‌: Standalone turbine control panel with integrated HMI, designed for small-to-medium steam turbine speed and load management
  • ‌CPC III Series‌: Next-generation current-to-pressure converter with SIL 3 functional safety certification, for critical safety-related turbine protection loops
Category: SKU: WOODWARD 9907-1200 CPC-II Brand:

Description

WOODWARD 9907-1200 CPC‑II Current-to-Pressure Converter & Digital Turbine Governor‌

 

‌Product Core Introduction‌

The ‌WOODWARD 9907-1200‌ is a high-performance industrial control device from Woodward, available in two primary functional variants: a precision CPC‑II current-to-pressure converter for turbine valve actuation, and a full-featured digital governor for steam turbine speed/load regulation. Designed for mission-critical power generation and oil & gas applications, it converts 4-20 mA control signals into proportional hydraulic pressure for precise turbine valve positioning, while integrating advanced closed-loop PID control and self-diagnostics to ensure maximum uptime and operational safety. It is fully compatible with major PLC/DCS systems and supports seamless retrofitting of legacy turbine control installations.

WOODWARD 9907-1200

‌Key Technical Specifications‌

 

Parameter Details
Nominal Input Voltage 18 – 32 V DC, wide operating range for industrial power supply fluctuations
Communication Interfaces RS-232, RS-485, Ethernet (Modbus TCP/IP) for seamless system integration
Display 2-line, 16-character front-panel LCD for on-site parameter configuration and status monitoring
Control Accuracy ±0.1% speed regulation precision, <100ms dynamic response time for sudden load changes
Signal Conversion Range Standard 4-20 mA input to proportional hydraulic pressure output for single-acting turbine valves
Built-in Features Adaptive PID tuning, critical speed avoidance for up to 3 resonant frequencies, first-out fault indicator
Protection Rating Integrated surge protection and EMI shielding, certified for harsh industrial environments
Physical Dimensions 260 mm × 330 mm × 370 mm, product net weight ‌2.3 kg‌
Power Rating 2700 W, operating ambient temperature 0°C to +55°C
Safety Design Failsafe spring return mechanism, redundant input capability for emergency valve closure during power loss

WOODWARD 9907-1200 伺服调速电机模块 原装进口 现货

真实性已核验

¥9399

 

‌Recommended Models from the Same Series‌

For users exploring compatible alternatives or extended functionality within Woodward’s turbine control portfolio:

  • ‌9907-162‌: Classic analog 4-20mA I/P converter, optimized for basic turbine valve positioning applications with lower cost requirements
  • ‌9905-864‌: Digital ProAct™ II electric actuator controller, supporting direct valve position feedback for high-precision flow regulation
  • ‌505E Digital Governor‌: Standalone turbine control panel with integrated HMI, designed for small-to-medium steam turbine speed and load management
  • ‌CPC III Series‌: Next-generation current-to-pressure converter with SIL 3 functional safety certification, for critical safety-related turbine protection loops

 

‌Professional Quality Control & Testing SOP‌

  1. ‌Signal Calibration‌: 100% of units undergo precision 4-20mA input to pressure output calibration, ensuring ±0.1% full-scale accuracy
  2. ‌Dynamic Response Test‌: Full-load step response verification to confirm <100ms reaction time for sudden load change commands
  3. ‌Environmental Stress Screening‌: Temperature cycling (-30°C to +70°C) and 10-55Hz vibration testing per IEC 60068 standards, simulating on-site turbine vibration conditions
  4. ‌EMI Compliance Test‌: Radiated and conducted interference testing to meet industrial EMC immunity requirements
  5. ‌Failsafe Validation‌: Power loss simulation test to confirm reliable spring return valve closure within 200ms during emergency shutdown
  6. ‌Final Functional Audit‌: Full verification of all communication ports, LCD display, and self-diagnostic fault detection functions before packaging

 

‌New Module Installation Guidelines‌

  1. ‌Pre-Installation Check‌: Confirm the 18-32 V DC power supply meets the input range, and verify compatibility with your existing turbine control system’s 4-20mA output channels
  2. ‌Mounting‌: Secure the unit on a standard 35mm DIN rail or dedicated control panel mounting bracket, maintain ≥20mm clearance around the unit for heat dissipation
  3. ‌Wiring Compliance‌: Use shielded twisted-pair cables for 4-20mA signal lines, strictly separate low-voltage signal wiring from high-voltage power circuits to avoid EMI interference
  4. ‌Hydraulic Connection‌: Connect the pressure output port to the turbine valve actuator using specified high-pressure hydraulic tubing, perform full leak testing before pressurization
  5. ‌Parameter Configuration‌: Adjust PID tuning parameters, critical speed avoidance thresholds, and failsafe action settings via the front LCD or Woodward OP View™ configuration software
  6. ‌Post-Installation Test‌: Conduct full loop test with a calibrated 4-20mA signal simulator, verify valve positioning accuracy and failsafe shutdown performance before putting the turbine into operation

WOODWARD 9907-1200

‌Application Scenarios & Key Features‌

  • ‌Application Scenarios‌:
    • Thermal power plants: Steam turbine speed, load, and exhaust pressure control for combined cycle and conventional generation units
    • Oil & gas industry: Compressor train anti-surge control and turbine-driven equipment valve actuation in refineries and pipeline stations
    • Petrochemical facilities: Precision flow regulation for process steam and gas turbine drives in explosive classified production areas
    • Industrial manufacturing: Rotating equipment speed control for large pumps, fans, and extruders in heavy industrial plants
  • ‌Key Features‌:
    • Adaptive PID tuning algorithm that reduces system overshoot by 30% compared to legacy analog governors, drastically improving load stability
    • Built-in first-out fault diagnostic indicator, which pinpoints the exact root cause of shutdown events to minimize unplanned downtime
    • Full backward compatibility with legacy Woodward 9907 series I/P converters, enabling direct drop-in replacement without modifying existing wiring or hydraulic piping
    • A U.S. power plant field application case confirmed 15% reduction in fuel consumption and 99.5% operational uptime over 12 months after upgrading to this model

 

‌Purchasing Reference Information‌

  • Authorized new original spot suppliers in the Chinese market offer two mainstream price ranges: ‌¥9399.00‌ for standard servo调速电机 module variants, and ‌¥28900.00‌ for full-featured digital governor configurations
  • Standard warranty period for new original units is 365 days, with global courier delivery available for urgent on-site maintenance requirements

WOODWARD 9907-1200 工业控制领域 电信号信号转换器

真实性已核验

¥2.89万

 

‌Frequently Asked Questions (FAQs)‌

‌Q1: Can this module be used to directly replace an older Woodward 9907 series I/P converter?‌
A: Yes, it maintains full pin-to-pin and hydraulic port compatibility with legacy 9907 series units, requiring no modification to existing field wiring or piping.

‌Q2: What is the maximum operating ambient temperature allowed?‌
A: The unit is rated for continuous operation up to +55°C, with derated performance guaranteed up to +70°C for short-term emergency conditions.

‌Q3: Does it support Modbus TCP communication for remote monitoring?‌
A: Yes, the built-in Ethernet port natively supports Modbus TCP/IP protocol, enabling real-time data transmission to your plant DCS system for remote process monitoring.

‌Q4: What happens to the turbine valve if the module loses power?‌
A: The integrated failsafe spring return mechanism will automatically drive the valve to the pre-configured safe shutdown position, ensuring the turbine performs a controlled emergency stop to prevent equipment damage.